The three metal posts, or bollards, that are missing on the Katy Trail should be replaced soon. The posts -- located near the Knox parking lot (2) and the
AAC (1) -- have been missing since the lighting construction was in full swing during the summer. After much difficulty and delay, it appears they are in the final stages of being manufactured. Our contractor tells us they are being galvanized right now, and could be in the ground by the end of January.
No comments:
Post a Comment